№ | Project name | Client | Type of work |
1 | Suul-Undur | Ejumen LLC | Feasibility study |
2 | Baruun del | Dugui-Uul LLC | Feasibility study |
3 | Tsagaan Ovoo | Altan barga LLC | Feasibility study |
4 | Tsagaan Ovoo | MCS Group | Scoping study |
5 | Bortolgoi | Khuder-Ord LLC | Feasibility study |
6 | Bayan- Ovoo | Olon Ovoot Gold LLC | Feasibility study |
7 | Chuluut tsagaan del | Mongol-Czech Metal LLC | Feasibility study |
8 | Umnud Altad | Kherlen Impex LLC | Scoping study |
9 | Urgun | Remar LLC | Feasibility study |
10 | Urgun (CPP) | Taimon Fluoritec LLC | Feasibility study |
11 | Urgun (Tailing dam) | Taimon Fluoritec LLC | Detailed design |