
Bayan-Airag heap leach facility
Consulting and quality control (QA/QC) for the construction of the heap leach facility at the Bayan-Airag copper-gold deposit: double geomembrane liner with geosynthetic clay liner (GCL) and geonet layers.
Engineering design
Within mine feasibility studies we plan the design, layout, siting, dimensions and construction phasing of tailings storage facilities, heap leach pads, water reservoirs and flood-protection structures suited to each deposit, together with the related economic and investment estimates. In total we have carried out tailings-facility and heap-leach planning and studies for 25 projects.

Consulting and quality control (QA/QC) for the construction of the heap leach facility at the Bayan-Airag copper-gold deposit: double geomembrane liner with geosynthetic clay liner (GCL) and geonet layers.

Consulting and quality control (QA/QC) for the construction of the processing plant’s emergency pond and flood reservoir: full HDPE geomembrane liner.

Construction of the tailings storage facility and flood channel of the wet processing plant: full HDPE geomembrane liner.

Construction of the tailings storage facility of the gold processing plant: HDPE geomembrane liner, delivered on a turnkey basis.

Construction of the tailings storage facility of the processing plant at the Shuvuun Khar Uul gold deposit: HDPE geomembrane liner, delivered on a turnkey basis.